Centinela Hospital Medical Center Pharmacy Remodel
Inglewood, California
This project was constructed in (4) phases to relocate Pharmacy and Pathology departments while maintaining hospital operations. Phase 1 included construction of Pathology department office spaces in an underutilized basement level space. Phase 2 included converting existing Pathology offices spaces into storage space to meet the demand of the growing facility. Phase 3 included construction of a 4,000 square foot Pharmacy department with associated open-concept dispensing area, storage spaces, offices, staff lounge, and complete USP 797/800 compounding areas for hazardous and non-hazardous drug compounding. Phase 4 included converting the existing Pharmacy spaces into additional storage space.